<?xml version="1.0" encoding="UTF-8" ?>
<?xml-stylesheet type="text/xsl" href="https://www.aras.com/community/cfs-file/__key/system/syndication/rss.xsl" media="screen"?><rss version="2.0" xmlns:dc="http://purl.org/dc/elements/1.1/"><channel><title>jshayy さんのアクティビティ</title><link>https://www.aras.com/community/members/jshayy</link><description>jshayy さんの最近のアクティビティ</description><dc:language>ja-JP</dc:language><generator>Telligent Community 12</generator><item><title>Ask A Question I</title><link>https://www.aras.com/community/achievements/460ac7df-7ccc-4c42-a204-9e05eef3be09</link><pubDate>Mon, 21 Jun 2021 16:52:21 GMT</pubDate><guid isPermaLink="false">916d3f7e-8ddc-42f8-8d45-380822f51406:fb97c125-00fe-4ade-932a-5b6a9de615d9</guid><dc:creator /><description>Ask a question in a forum.</description></item><item><title>Fixed/Float Latest vs Effective</title><link>https://www.aras.com/community/f/applications/3192/fixed-float-latest-vs-effective</link><pubDate>Wed, 08 Mar 2017 18:48:33 GMT</pubDate><guid isPermaLink="false">916d3f7e-8ddc-42f8-8d45-380822f51406:12b50cba-63dd-45d8-b3de-685b811e3608</guid><dc:creator>jshayy</dc:creator><description>Hello,

I am desiring in most applications to float to effective or released generations rather than latest generations. This results in released engineering BOM&amp;#39;s children components floating to the latest generation, which may be preliminary. I have preliminary parts present in a released baseline while the child component is changing as such. Is there a way to configure to float to the &amp;quot;released&amp;quot; or &amp;quot;effective&amp;quot; not &amp;quot;latest&amp;quot; generation? I want a released BOM with a child under change to show the released, effective, generation &amp;quot;in change&amp;quot; not show the &amp;quot;preliminary&amp;quot; part.

Am I seeing preliminary parts in the BOM relationship of a released assembly simply because I have the rights to see that generation? Or is there a specific PLM/Aras intent to have released assemblies contain unreleased/preliminary components by floating to latest generation in this relationship?

Thanks for your time in this matter.

Regards,

J&lt;div style="clear:both;"&gt;&lt;/div&gt;</description></item><item><title>Sample Data for V11 SP12</title><link>https://www.aras.com/community/f/getting-started/3652/sample-data-for-v11-sp12</link><pubDate>Mon, 09 Apr 2018 15:28:48 GMT</pubDate><guid isPermaLink="false">916d3f7e-8ddc-42f8-8d45-380822f51406:e2bfe778-d81e-4b51-9309-1b9afc8711e5</guid><dc:creator>jshayy</dc:creator><description>The sample data posted only allows sample data for V11 SP9. any update to when we get SP12 sample data?&lt;div style="clear:both;"&gt;&lt;/div&gt;</description></item><item><title>Sample Database 11 SP9</title><link>https://www.aras.com/community/f/community/3635/sample-database-11-sp9</link><pubDate>Fri, 16 Mar 2018 15:29:02 GMT</pubDate><guid isPermaLink="false">916d3f7e-8ddc-42f8-8d45-380822f51406:ca3c0ffa-9ac3-468d-9760-0aac1cf502f5</guid><dc:creator>Former Member</dc:creator><description>I just installed Innovator 11 SP12. The only download for the sample database is 11 SP9. I get an error &amp;quot;&lt;em&gt;You are attempting to install the sample database to Aras Innovator 11.0 SP12. The sample database requires Aras Innovator 11.0 SP9&amp;quot;&lt;/em&gt; when I try and install the sample db.

I guess I could hack the config file and change sp12 to sp9. Install the db then change it back.

Other options?

J

&amp;nbsp;&lt;div style="clear:both;"&gt;&lt;/div&gt;</description></item></channel></rss>