See from a technical perspective how Baltur replaced their legacy PDM system with Aras and changed their CAD systems at the same time.

Download your copy of Baltur: Replacing a Legacy PDM System with Aras PLM

Adobe Reader is required to view PDF files.

Get Adobe Acrobat Reader