Fixed/Float Latest vs Effective

Hello, I am desiring in most applications to float to effective or released generations rather than latest generations. This results in released engineering BOM's children components floating to the latest generation, which may be preliminary. I have preliminary parts present in a released baseline while the child component is changing as such. Is there a way to configure to float to the "released" or "effective" not "latest" generation? I want a released BOM with a child under change to show the released, effective, generation "in change" not show the "preliminary" part. Am I seeing preliminary parts in the BOM relationship of a released assembly simply because I have the rights to see that generation? Or is there a specific PLM/Aras intent to have released assemblies contain unreleased/preliminary components by floating to latest generation in this relationship? Thanks for your time in this matter. Regards, J
Parents Reply Children
No Data