jsnosal - Thursday, March 7, 2013 3:40 PM:
We are looking at using generations to be able to look at the historical bill of materials. I'm running into an issue where I pull a previous generation that was revised and has a sub assembly that was also revised. When I pull the top level assembly from the previous generation, the sub assembly is in a preliminary state. Its not showing it in a released state.
Is there a setting that I change inside ARAS that will show everything that is released at a certain time. I'm looking at something that will lock all the relationships in time. So that when we want to look at a previous build, we are only seeing the released state of all the products.
Thank you for your help.