  • Upload missing document relationship in Process Plan. "Add" statement doesn't work

    I need to upload relationship between Operation Document and the Documents. As you can see from the picture below the hierarchy of Process Plan is: Process Plan--> Operation Number (which is `sort_order`, in this case it is 20)-->Document I have an…
  • How to define export data for Excel, Word or PDF?

    Hi everyone, We need to export some of out Process Plans for external use, but when we export to Word, PDF or Excel, only the name, description and process plan number are included in the document. How could we go about configuring this? Th…
  • How to rollup cycle time and setup time of operations and set that value to a process plan property

    Hi, I have a property called 'duration' in mpp_ProcessPlan and i would like to fill that Property value with sum of cycle time + setup time of all the operations associated with a process plan. how to write server side method for relationship Types…
  • How to set users not to modify nor delete when an item of Process Plan is in released state

    Hi, I would like to know how to set users not to modify nor delete when a item in process Plan is in released state. I'm working on Aras V12.0. Thanks.
  • How to Import Data from Aras Innovator V11.Sp12 to V12.0

    Hi, I recently installed Aras Innovator V12.0. I was using Aras Innovator V11.Sp12 where all my work was done. Now, i would like to switch to V12.0, I have few tables around 9 tables in which two tables of Manufacturing Process Plan and Operations,…
  • How to add items in Manufacturing process plan Workbench

    Hi Folks, I'm working on Manufacturing process plan in Aras innovator version 11 SP12. I would like to add other items, which have a relationship with operations, in the workbench to select, drag and drop the items into the operation. I tried to modify…
  • How to synchronize the data of MPP_process plan with all its releationships with PostgreSQL Database

    Hi, I'm a research student and we are doing a university project on PLM, we have an idea of storing and interacting the data of PLM systems with other systems like MES and ERP so we thought to create a central database through which every system will…
  • How to roll-up cycle times and costs of MBOM in Aras MPP Process Plans?

    At the moment, we can add cycle times and setup times to operations, and cycle times to steps. But this information does not display anywhere once entered. That is fine, but at least if there was the ability to roll-up the cycle times of all the operations…